Today I was able to get the c-channel screwed down all the way around. It's in place now, ready to be bolted through the floor. Then I can get started bucking rivets. My kids are already fighting over who gets to man the bucking bar. I'm going to try to re-use my banana wraps. They should be fine, but I can always send an order to Airpartsinc.com for some new aluminum if I need to.
I wish I'd used a better quality plywood when I did the floor. There are a few voids, but the wood was literally bathed in Olympic waterproofing when I was prepping the floor for installation, so it should be OK. I also plan to skim the entire subfloor with leveler before I cover it up with whatever flooring I decide to go with.
Tuesday, September 9, 2008
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment